JSWECE has developed a 300 MW high fidelity dynamic thermal power plant simulator which is a replication of 300 MW power plant units of JSW Energy at Vijayanagar (4x300 MW) and Ratnagiri (4x300 MW).

The 300 MW Operator Training Simulator (OTS) can be used for Process Design; Operating Strategy Development; Process Troubleshooting; and Regulatory, Sequencing and Supervisory control strategy testing. The simulator is a easy to use system with graphical displays and model building programs.The OTS system enables operators to learn the dynamics of the plant and validate the process control logics and evaluate possibility of de-bottlenecking in the existing plant or even before the plant is commissioned. This facilitates early plant start up and effective abnormal situation handling.

Operator Training Simulator Capabilities:

Operator Training

  • Improve understanding of general plant theory and concepts.
  • Increase knowledge of plant systems and their function and interaction with other systems.
  • Enhance understanding of plant control theory and operation.
  • Gain operating experience, confidence and accuracy in normal and abnormal plant operations.
  • Provide practice following specific operating procedures.
  • Demonstrate recovery from various upsets and malfunctions.

Control Analysis, Configuration and Tuning

  • Develop and conduct control system analyses.
  • Troubleshoot problems that may occur on the actual plant controls.
  • Test control design changes before implementing them in the actual plant.
  • Pre-tune new control loops.
  • Tune emergency control loops without risking plant operation.

Engineering

  • Evaluate equipment line-up changes.
  • Perform simple de-bottlenecking studies by eliminating key constraints.
  • Evaluate alternative operating procedures.
  • Perform 'what-if' studies.

Control Room of JSWEL's 4x300 MW Power Plant at Vijayanagar

23rd June 2009
JSWECE Signs an MoU with MSRIT, Bangalore for jointly conducting a one-year full-time PG Diploma in Power Plant Engineering from the academic year 2009-2010.

_______________________________________________

22nd February 2010
Owing to a massive demand for trained power professionals in the Indian Power Sector, JSWECE starts a 2nd batch of PG Diploma in Power Plant Engineering with 60 students.

_______________________________________________

22nd February 2010
JSWECE commissions its dynamic, high-fidelity, PC-based 300 MW Thermal Power Plant Simulator. The state of the art Simulator is dedicated to the nation. Training program on the Simulator launched with 6 trainees from JSWEL Ratnagiri.

_______________________________________________

23rd April 2010
Mr.K.P.Singh, Secretary, CEA and Ms. Anjuli Chandra, Director-HRD, CEA visit JSWECE for renewal of recognition. They appreciate the efforts of JSW Energy to develop the Institute. The visitors speak to the PG Diploma students on the occassion.

_______________________________________________

17th May 2010
Batch-1 PG Diploma Students return from 4-month On Job Training at JSWEL, Barmer and JSWEL, Ratnagiri. The students get exposure to erection, commissioning, operation and maintenance of both CFBC plant of 135 MW at Barmer and PF fired plant of 300 MW at Ratnagiri.

_______________________________________________

1st June 2010
Mr. Lalit Kumar Gupta takes over as Jt. Managing Director and Chief Executive Officer of JSW Energy Ltd.

_______________________________________________

18th June 2010
Col. Mohan Bhandari takes over as Head of Corporate HR of JSW Energy Ltd. Col. Bhandari is Head of JSW Energy Centre of Excellence also.

_______________________________________________
PG Diploma in Power Plant Engg.
Download Admission Notice here.
Download Course Brochure here.
Download Application Form here.
Download Sponsorship Certificate here. (for sponsored candidates)

 
Frequently Asked Questions | © 2009 JSW Energy Centre of Excellence. All rights reserved